Completed Projects

Whalley Blvd. Arterial Extension – Fraser Highway to 97A Ave

Clearing and grubbing, 2,500 m3 of excavation, 3,500 tonnes of aggregates, knotweed removals, traffic signals, concrete curbs, storm and drainage works, 750 tonnes of asphalt paving, retaining wall and landscape.

City Street

McKee Road at McKee Drive Traffic Signals

Clearing & grubbing, 200 m3 of excavation, 500 tonnes of aggregates, asphalt paving, traffic signals for new intersection, concrete curbs, sidewalks and driveways, storm and drainage works, retaining walls and landscaping

City Street

Queen Elizabeth Secondary School Roadworks

Offsite roadworks and intersection upgrades on King George Blvd at 94A Avenue, including the installation of new traffic signals, asphalt and concrete removals, asphalt milling and paving, line paint, concrete curbs, sidewalks, driveways, and construction of a new median including median fencing.

City Street

2023 Abbotsford Traffic Signals (Two Sites)

Signal modifications and installation of new traffic signals at two intersections in Abbotsford. 70 Lm of Curb and Gutter, sidewalks, milling, paving, irrigation water service and landscaping.

City Street

Sardis Secondary School Civil Early Works

185 Lm of 150mm dia watermain installation with DVCA and Meter Chambers, Storm pipe, catch basins and manhole installation, gas line replacement, 1000 m3 of excavation, 3000 tonnes of aggregates, 700 Lm of curb and gutter, hydro and tel conduit installation, 350 tonnes of asphalt paving.

City Street

72 Avenue Connector with Fraser Highway

Clearing & grubbing, 6000 m3 of excavation, 5000 tonnes of aggregates, 2200 tonnes of asphalt paving and milling, contaminated soils, traffic signals and modifications for two intersections, concrete curbs, sidewalks and driveways, 250 Lm of storm (675 diameter largest size) and drainage works, 75 Lm of Ductile Iron watermain, retaining walls, line paint and landscaping.

City Street

Milling and Paving Repairs (Centerm and Fraser Surrey Terminals)

50,000 m2 of milling at depths ranging from 100mm – 75mm thick. 9000 tonnes of asphalt paving.

City Street

Ranch Park Area Pavement Rehabilitation

11,200 m2 of milling at depths of 100mm thick. 2100 tonnes of asphalt paving, manhole adjustments, line painting and road reshaping.

City Street

MRN Pavement Rehabilitation - Como Lake and Clarke Road

6,600 m2 of milling at depths ranging from 60mm – 150mm thick. 1400 Scope of Work tonnes of asphalt paving, manhole adjustments, line painting and road reshaping.

City Street

2023 Road Rehabilitation Projects

23,000 m2 of milling at depths ranging from 50mm – 200mm thick. 3000 tonnes of asphalt paving, manhole adjustments, line painting and excavation, aggregates and road reshaping.

City Street